If you or a loved one is considering a walk-in shower for safety, accessibility, or comfort, one of the first questions that comes up is: How long is this going to take? We get it—bathroom upgrades can be disruptive, and you want to plan accordingly. At COR Freedom, we’ve helped countless Michigan families navigate this process, so let’s walk through the typical timeline together.
The Short Answer: 1 to 3 Days for Most Projects
In most homes, putting in a walk-in shower takes 1 to 3 days once the crew arrives. Some projects are finished in a single day, especially if the existing tub or shower is being replaced with a similarly sized unit. Others take a bit longer depending on the scope.
But let’s break that down more clearly.
What Affects the Timeline?
Every home is different, and a few key factors can impact how long your walk-in shower setup will take:
Current bathroom layout – Replacing a tub with a walk-in unit is usually faster than relocating plumbing or moving walls.
Type of walk-in shower – Prefabricated units are generally quicker to put in than custom-tiled showers.
Condition of existing materials – If there’s water damage, mold, or structural issues behind the walls, extra time may be needed.
Additional upgrades – Adding grab bars, new flooring, or updated fixtures can add a little more time—but these extras often make the space safer and more enjoyable.
What's the Process Like?
Here’s a general overview of how the timeline plays out:
Day 1: Removal and Prep
The team will take out the old tub or shower, check the wall and floor conditions, and prep the area.Day 2: Shower Unit Goes In
The new walk-in shower is placed, leveled, and secured. Plumbing is connected, and waterproofing steps are taken.Day 3: Finishing Touches (if needed)
Wall surrounds, grab bars, trim work, caulking, and cleanup are completed.
Some projects wrap up in just one day—especially when there are no surprises behind the walls and the new unit fits seamlessly into the space.
Can It Take Longer?
Yes, especially if:
Permits or inspections are required
The bathroom layout is being dramatically changed
There’s hidden damage or outdated plumbing
If that’s the case, our team keeps you updated every step of the way. Our goal is always to minimize disruption and maximize safety and quality.
Planning Ahead
If you’re coordinating this upgrade for a loved one returning home from rehab or preparing for aging in place, we recommend planning the job 2–3 weeks in advance to allow time for product selection and scheduling. Once the work begins, it usually moves quickly.
Get Peace of Mind Knowing It's Done Right
We know how important it is to feel safe and comfortable at home. That’s why we offer high-quality walk-in showers and expert crews who get the job done with care and efficiency.
Curious what it would take in your home? Reach out and we’ll be happy to provide a timeline and walk you through the next steps.